Archive
January 2011 | |
For “Bukhtarminskaya Cement Company JSC”: chemical sampling of soil in polluted areas at the border of sanitary protection area and preparation of registration passport for Oktabrskiy pit area of “Bukhtarminskaya Cement Company JSC”. Next >>> |
January 2011 | |
For Kazzinc Ltd.: laboratory researches for development of technology for extraction of ore from resistant gold-bearing concentrates by electrochemical hydrochlorination method. Next >>> |
January 2011 | |
Fire hazards at Kusmurun deposit have been determined (underground mine). Predictive estimation of fire hazards of Kusmurun deposit in case of underground mining has been accomplished on the basis of laboratory researches of core ore samples and geologic parameters. Mining and engineering parameters have been determined on the basis of requirements of Technical-Economic Assessment for underground mining of Kusmurun deposit and on the basis of design and engineering documentation. Next >>> |
January 2011 | |
Physical-and-mechanical and geological-and-mechanical parameters of rocks and ores have been examined for estimation of stability of pit wall at Akbastau deposit (open mining). Next >>> |
January 2011 | |
For “Kazakhmys Corporation LLC”: development of technology and process procedures for processing of copper-zinc sulfide ores from Akbastau deposit in accordance with conditions of Karagakyinskaya ore dressing plant. Next >>> |
January 2011 | |
For Mednogorskiy copper-sulfur plant (Russia): process procedures for engineering of project “Construction of section for fuming of slag from smelting unit “Pobeda”” have been prepared. Next >>> |
January 2011 | |
For JSC “TSC Kazchrome”: detailed design of cement-stowing complex for “Pervomayskoye” deposit has been developed. Next >>> |
January 2011 | |
For "Kazakhmys Project LLC": laboratory researches, concerning leaching of core samples of oxidized copper ores of Aktogay deposit – 10 tests in column. Next >>> |
August 2010 | |
For JSC “Chelyabinskiy Zinc Plant” (Russia), there was studied influence of impurities in zinc concentrates produces at processing of the ores from Altay and Urals deposits on quality of roasting at fluid-bed furnaces at ChZP. Next >>> |
August 2010 | |
For “Yubileynoe” ltd there was prepared Process Procedure for processing og the primary gold-bearing ore of Yubileynoe deposit. Next >>> |
|