News
March 2015
Engineering supervision over construction of gold recovery plant Engineering supervision over construction of gold recovery plant for processing of ores from Sharyk Deposit by heap leaching as per VNIItsvetmet design was performed during 2014. Next >>>
March 2015
Feasibility study of hydrometallurgical processing of gold-bearing concentrates of Stepnogorsk Integrated Mining and Chemical Plant, Ltd. Key indicators of hydrometallurgical processing of gold-bearing concentrates under conditions of Stepnogorsk Integrated Mining and Chemical Plant, Ltd. were defined based on the conducted study. Next >>>
March 2015
Engineering supervision over construction of gold recovery plant Engineering supervision over construction of gold recovery plant for processing of ores from Sharyk Deposit by heap leaching as per VNIItsvetmet design was performed during 2014. Next >>>
January 2011
For “Saryarka-IRON Ltd.”: preliminary technical and economic calculation of effectiveness of processing of iron and iron-manganese ores from Pits No. 1, No. 4 and No. 5 of “Bolshoy Kitay” deposit, using gravitation (short) technology. Next >>>
General Information about the Institute
VNIITSVETMET is a part of National Enterprise of Complex Processing for Mineral and Raw Material of Ministry of Industry and Innovative Technologies of the Republic of Kazakhstan.
Departments and Laboratories
Address:
RK, 070002, Ust-Kamenogorsk,
1 Promyshlennaya str., VNIItsvetmet
Tel.: (7232) 503460, 753773
Fax: (7232) 753771, 753773
e-mail: VCMnauka2008@mail.ru
Site: http://vcm.ukg.kz